DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations.     Month   1   2   3   4   Throughput time (days) ?   ?   ?   ?   Delivery cycle time (days) ?   ?   ?   ?   Manufacturing cycle efficiency (MCE) ?   ?   ?   ?   Percentage of on-time deliveries 77 % 72 % 69 % 66 % Total sales (units) 3880   3715   3525   3391       Management has asked for your help in computing throughput time, delivery cycle time, and MCE. The following average times have been logged over the last four months:     Average per Month (in days)   1 2 3 4 Move time per unit 0.7   0.4   0.5   0.5   Process time per unit 3.7   3.5   3.3   3.1   Wait time per order before start of production 25.0   27.4   31.0   33.5   Queue time per unit 4.5   5.2   6.0   6.9   Inspection time per unit 0.6   0.8   0.8   0.6     Required: 1-a. Compute the throughput time for each month. 1-b. Compute the delivery cycle time for each month. 1-c. Compute the manufacturing cycle efficiency (MCE) for each month. 2. Evaluate the company’s performance over the last four months. 3-a. Refer to the move time, process time, and so forth, given for month 4. Assume that in month 5 the move time, process time, and so forth, are the same as in month 4, except that through the use of Lean Production the company is able to completely eliminate the queue time during production.  Compute the new throughput time and MCE. 3-b. Refer to the move time, process time, and so forth, given for month 4. Assume in month 6 that the move time, process time, and so forth, are again the same as in month 4, except that the company is able to completely eliminate both the queue time during production and the inspection time. Compute the new throughput time and MCE.

DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations.

 

  Month
  1   2   3   4  
Throughput time (days) ?   ?   ?   ?  
Delivery cycle time (days) ?   ?   ?   ?  
Manufacturing cycle efficiency (MCE) ?   ?   ?   ?  
Percentage of on-time deliveries 77 % 72 % 69 % 66 %
Total sales (units) 3880   3715   3525   3391  
 

 

Management has asked for your help in computing throughput time, delivery cycle time, and MCE. The following average times have been logged over the last four months:

 

  Average per Month (in days)
  1 2 3 4
Move time per unit 0.7   0.4   0.5   0.5  
Process time per unit 3.7   3.5   3.3   3.1  
Wait time per order before start of production 25.0   27.4   31.0   33.5  
Queue time per unit 4.5   5.2   6.0   6.9  
Inspection time per unit 0.6   0.8   0.8   0.6  
 

Required:

1-a. Compute the throughput time for each month.

1-b. Compute the delivery cycle time for each month.

1-c. Compute the manufacturing cycle efficiency (MCE) for each month.

2. Evaluate the company’s performance over the last four months.

3-a. Refer to the move time, process time, and so forth, given for month 4. Assume that in month 5 the move time, process time, and so forth, are the same as in month 4, except that through the use of Lean Production the company is able to completely eliminate the queue time during production.  Compute the new throughput time and MCE.

3-b. Refer to the move time, process time, and so forth, given for month 4. Assume in month 6 that the move time, process time, and so forth, are again the same as in month 4, except that the company is able to completely eliminate both the queue time during production and the inspection time. Compute the new throughput time and MCE.

Tired of numerous paper assignments?
Rely on us and receive professional paper writing assistance!
Professional paper Writing Assistance

Who We Are

We are a professional website for customized writing. If you searched a question and stumbled into our website, you are in the right place to receive assistance with your coursework.

Do you handle any type of coursework?

Yes. We have displayed prior orders to demonstrate our experience. We can answer this question for you as we have previously. Please fill out our Order Form so that we may ensure its flawlessness. Correctly completing the order form will help our staff with reference, requirements, and future communication.

Is it hard to Place an Order?

  1. Click on the “Order Now” tab at the top menu or “GET A FREE QUOTE” icon at the bottom and a new page will appear with an order form to be filled
  2. Fill in the initial requirements in the small order form located on the home page and press “continue” button to proceed to the main order form or press “order” button in the header menu. Starting from there let our system intuitively guide you through all steps of ordering process. Submit detailed paper instructions, upload necessary files if needed and provide your contact information – you are almost done!
  3. Proceed with the payment- click on “PROCEED TO CHECKOUT” at the bottom of the page. From there, the payment sections will show, follow the guided payment process and your order will be available for our writing team to work on it. All your payments are processed securely through PayPal. This enables us to guarantee a 100% security of your funds and process payments swiftly.
  4. Delivery- Once finished, your final paper will be available for download through your personal dashboard. You will also receive an email notification with a copy of your paper attached to it.